Three Counties Showground – Commercial Flooring
In preparation the 3000 square meter area was heavily shot-blasted to remove the existing resin coatings and all areas were swept and vacuumed cleaned. All the existing expansion joints were recut and repaired using epoxy mortar compound before two coats epoxy resin primer were applied to the total floor area.
Finally, a 3mm self-levelling epoxy resin screed, in the clients chosen light grey gloss was laid, giving the space a light an airy feel.
The 3000 square meter project was completed in 12 days, on time and in budget, providing the client with a very robust, durable, hard wearing surface, that is good to look at that will be maintenance free and can be used for many years to come.